GROUT PUMPS RECIPROCATING TYPE. CEMENT GROUT PUMPS.
CAPACITIES 1Kg / SQCM TO 20Kg / SQCM. DELIVERY 1 BAG / HR TO 200 BAG / HR. |
Cement grout pump
|
USED AT IPS-BANDRA TUNNEL & GHATKOPAR HIGH LEVEL TUNNEL.
HIGH DELIVERY RATE & LOW WORKING AREA.
DELIVERS 20 TO 50 BAGS /HR
AT 10KG/SQCM |
|
EPOXY / P.U . TWO / THREE COMPONENT
GROUT PUMP.
AUTOMATIC DOZING. DELIVERS UP TO
2 LTRS / MIN.
PRESSURE
0 - 20 Kg/ SQCM.
MACHINE SPECIALY DEVELOPED FOR
LOW WORKING SPACE AREAS.
USED AT DHARAVI TUNNEL FOR DYWIDAG-
AG & BMC.
|
SCOPE OF MATERIAL SUPPLY AND EXECUTION
|
Sr. No. |
Description |
Supplied / Executed by |
1 |
Expansion joint filler board |
Supply by Elcon products |
2 |
Compressible Debonding strips |
Supply by Elcon products |
3 |
Temporary seal of 8 mm rod |
Supply by Elcon products |
4 |
Green concrete-saw grove 4mm X 110 mm |
Execution by Eff-tech |
5 |
Widening of grove to 8 / 10 mm |
Execution by Eff-tech |
6 |
Sealant application (silicon,P.U.,Polysulphide,etc) |
Execution by Eff-tech |
7 |
Sealant (silicon,P.U.,Polysulphide,etc) |
Supply by Elcon products |
8 |
Pre formed seal (Neoprene seal) |
Execution by Eff-tech |
9 |
Pre formed seal (Neoprene seal) |
Supply by Elcon products |
|
Schedule of grove cutting :
1. Initial cutting is carried out at green-concrete stage.
2. Final cut is done after 21 to 28 days.
3. Sealant is done on bone dry surface, generally after 1 or 2 days, i.e. between 30th and 35th day.
We help you in selecting & negotiating sealant manufacturers, also we optimize sealant consumption to suit & qualify various tests at site. We conduct field test on trial patch to technically ratify the sealant suitability.
We also undertake complete contract with sealant.
|
|